15 Fire Protection

 

15S-13/09, The robustness of joints between steel beams and concrete filled tubular (CFT) columns under fire conditions  (2009-05-31)

Location: University of Manchester
Person: Y.C. Wang
Language: English

 

15Q-12/03 Improvement and extension of the simple Calculation Method for Fire Resistance of an unprotected Concrete Filled Hollow Columns  (2003-12-31)

Location: CTICM
Person: C. Renaud / D. Joyeux / J. Kruppa
Language: English

 

15R _PROPOSAL 02.P7 - Unprotected Concrete Filled Columns Fire Tests - Verification of 15Q  (2002-12-31)

Location: CTICM
Person: C. Renaud / D. Joyeux / J. Kruppa
Language: English

 

15R_INTERIM 1 - Unprotected Concrete Filled Columns Fire Tests - Verification of 15Q  (2001-12-31)

Location: CTICM
Person: C. Renaud / D. Joyeux
Language: English

 

15P-12/00 Fire resistance of hollow sections filled with high strength concrete  (2000-12-31)

Location: Hosser, Hass & Partner
Person: R.Hass / J.Ameler / H. Zies
Language: English

 

15Q Part 1 - Axially Loaded Columns  (1999-12-31)

Location: CTICM
Person: C. Renaud / B. Zhao / J. Kruppa
Language: English

 

15QPart 2 - Eccentrically Loaded Columns  (1999-12-31)

Location: CTICM
Person: C. Renaud / D. Joyeux
Language: English

 

15N-96 Micro-comptuer Software for the generalised fire design of unprotected concrete-filled (UCF) SHS columns  (1996-12-31)

Location: CTICM and TNO
Person: L. Twilt / J. Kruppa / C. Both / G. Tabet
Language: English

 

15C1-95 Fire resistance of composite columns using unprotected hollow sections  (1995-12-31)

Location: Braunschweig University
Person: J. Stanke
Language: German

 

15 K - CIDECT design guide on the fire resistance of HSS columns  (1994-12-31)

Location: Design Guide Published 1994
Person: L. Twilt, W. Klingsch, R. Hass
Language: Design Guide Published 1994

 

15H-21/91E - Fire Tests on Cleat Connections to Concrete Filled RHS Columns (1st & 2nd Phase Tests)  (1991-12-31)

Location: Warrington Fire Research Station
Person: M. Edwards
Language: English

 

15L-23/91 Reinforcement of concrete by steel fibres in composite columns; simplified manufacture and defined fire resistance  (1991-12-31)

Location: -
Person: R. Hass / D. Dutta
Language: English

 

15H-90/15E - Fire Tests on Cleat Connections to Concrete Filled RHS Columns (1st & 2nd Phase Tests)  (1990-12-31)

Location: Warrington Fire Research Station
Person: -
Language: English

 

15G-89/3 Fire Resistance of Hollow Section Composite Columns of Small Cross sections  (1989-12-31)

Location: Wuppertal University
Person: K. G. Wurker / W. Klingsch
Language: English

 

15 ? -89/7-E - Fire resistant connections between concrete filled hollow sections and composite steel/concrete beams  (1989-12-31)

Location: Berlin University
Person: D. Hass / W Klingsch
Language: English

 

15J-88/12 Design Charts for the Fire Resistance of Concrete Filled HSS Columns under centric Loading  (1988-12-31)

Location: IBBC-TNO
Person: L. Twilt
Language: English

 

15F-86/7 Harmonisation of the calculation rules for the fire resistance of Concrete Filled HSS Columns  (1986-12-31)

Location: Tech centre for Fire Prevention
Person: L. Twilt / P. W. Haar
Language: English

 

15C1/C2-83/27 Fire resistance of concrete filled hollow sections (without external protection)  (1983-12-31)

Location: Braunschweig University
Person: K. Kardina / W. Klingsch
Language: English

 

15B-15C-83/6 Fire stability of concrete filled hollow section columns  (1983-12-31)

Location: Cannes France
Person: J. P. Grimault
Language: English

 

15D-81/10 Fire behaviour of external hollow section columns  (1981-12-31)

Location: Maizière lès Metz
Person: J. P. Grimault
Language: English

 

15B-80/10 Determination of the fire life of concrete filled hollow sections CSTB  (1980-12-31)

Location: Boreham Wood-CTICM
Person: G. Grandjean / J. P. Grimault / L. Petit
Language: French

 

15A-76/36 Fire protection tests on concrete filled columns  (1976-12-31)

Location: France
Person: -
Language: French